The problem first appeared in the Unit 1 of the So Simo Hydroelectric Power Plant was due to melting of the babbitt pad linings and led to an emergency interruption on the machine operation, which was kept out of service until the pads were repaired. Failures were associated with high temperatures in the pads, up to 84 1C on summer time